| Network, routings, BOMs and production-version master data | Included Input structure for MPS/MRP; this is not Network Design. | Included, with managed governance and scale. |
| Heuristic MPS/MRP | Included Sequential generation of purchase, production, transfer and inventory requirements. | Included as a fast planning option. |
| Capacity- and lead-time-aware Constrained Plan | Included Heuristic capacity leveling, build-ahead and eligible origins, without a solver. | Expanded with simultaneous optimization and advanced constraints. |
| Point 06AUnconstrained, Constrained and Working Plan scenarios | Included The heuristic exposes the unrestricted requirement, applies capacity and lead-time rules, and preserves the feasible plan and residual gaps. | Expanded with optimizer-driven scenarios and advanced constraints. |
| Point 06BConstraint gap, sales impact and sensitivity analysis | Capacity bottlenecks and unserved residuals remain visible for planner review. | Enterprise Trace the demand affected by each productive, logistics, material or lead-time restriction and test the additional capacity or lead-time reduction required for full service. |
| Point 01Brownfield / Greenfield Network Design | Not included Network data supports planning, but Community does not redesign the network. | Enterprise Suggest candidate locations and optimize which plants, warehouses or distribution centers should be activated or deactivated. |
| Network Design economic trade-off | Not included | Enterprise Balance fixed logistics cost, tier-1 and tier-2 freight, production, raw materials, capacity, service and margin under one global objective. |
| Global optimizer and process-chain orchestration | Not included | Enterprise Service, cost, inventory, capacity and margin solved together. |