DRP & Load Building

Turn limited supply into explicit service and transport decisions.

Prioritize customers and channels, allocate availability through fair share, and convert deployment needs into viable loads across dedicated, semi-dedicated and spot fleets.

Allocate product and transport together.

DRP is not only a replenishment quantity. It is the decision of who receives constrained supply, from where, when and in which vehicle.

01 · DEPLOYMENT

Position supply where future demand will occur.

Translate demand, projected inventory, open orders and replenishment lead times into transfers between plants, warehouses and distribution centers while preserving the alternatives available in the network.

02 · PRIORITY & FAIR SHARE

Make allocation policy explicit.

Rank customers, channels or markets and distribute shortages consistently. Fair share can protect current demand or the formation of target safety stocks, replacing manual negotiation with a repeatable policy.

03 · LOAD & VEHICLE FORMATION

Turn transfer needs into transport.

Build consolidated loads across dedicated, semi-dedicated and spot fleets using the capacity, eligibility, lane, shipment multiple and cost profile of each vehicle type. Compare service and economics before releasing trips.

04 · SECTOR-SPECIFIC RESTRICTIONS

Add shelf life when the product requires it.

For perishable or aging-sensitive products, avoid shipping lots that will not retain sufficient shelf life at destination and expose future writeoff risk. These rules extend DRP without defining the general process.

See the demand lost to each constraint.

Unconstrained and constrained DRP scenarios separate the distribution opportunity from fleet, lane, stock and lead-time feasibility.

Operational DRP in Community. Integrated fleet optimization in Enterprise.

The numbered rows make customer prioritization, fair share, load formation and constraint analysis explicit. Enterprise solves supply, allocation and transport formation as one richer decision.

CapabilityCommunityPro / Enterprise
Heuristic DRP, deployment and priority-based replenishmentIncludedIncluded as a fast planning option.
Point 05ACustomer prioritization and fair-share allocationIncluded Heuristic policies allocate constrained supply by priority and can protect either current demand or safety-stock formation.Expanded with simultaneous network, inventory and transport constraints.
Point 05BVehicle-aware load building across fleet typesNot includedEnterprise Form loads across dedicated, semi-dedicated and spot fleets using each type’s lane eligibility, capacity, shipment multiple and cost profile.
Simultaneous supply, allocation and transport optimizationNot includedEnterprise
Point 06Unconstrained versus constrained distribution scenariosDeployment gaps remain visible after stock, lane and lead-time rules are applied.Enterprise Trace demand impact by destination, customer and period, then test fleet, capacity or lead-time changes required to recover service.
Shelf-life, lot expiration and projected writeoffNot includedEnterprise For relevant product configurations.